[{"data":1,"prerenderedAt":34},["ShallowReactive",2],{"service-guides-construction-zh-Hans":3},[4,11,17,22,26,30],{"slug":5,"title":6,"description":7,"service":8,"date":9,"updated":10},"nyc-renovation-permits","纽约装修、电路及水路工程的开工许可（开工纸）规定","纽约哪些装修、电路及水路工程需要向纽约市建筑局（DOB）申报开工许可（俗称开工纸），由谁申报，以及长岛的规定有何不同。","electrical","2026-10-24","2026-10-25",{"slug":12,"title":13,"description":14,"service":15,"date":9,"updated":16},"compare-contractor-estimates","如何比较装修承包商的估价","比较纽约装修及电路工程估价的实用清单：施工范围、暂定金额、不包含项目、开工许可、付款安排、执照及保险。","renovation","2026-10-26",{"slug":18,"title":19,"description":20,"service":21,"date":10,"updated":16},"nyc-ny-gas-ban-new-buildings","纽约市与纽约州新建筑禁用煤气规定","纽约市地方法第 154 号与纽约州《全电气建筑法》对新建房屋和整体翻新的要求，以及截至 2026 年 10 月 25 日的执行状态。","construction",{"slug":23,"title":24,"description":25,"service":21,"date":10,"updated":10},"nyc-new-building-air-leakage-test-certificate-of-occupancy","2025年纽约市能源法规下的新建筑气密性测试与使用证明","2025年纽约市能源法规要求所有新建筑通过第三方整栋气密性测试，未通过前DOB不签发使用证明（CO）。本文说明测试要求与施工阶段的准备。",{"slug":27,"title":28,"description":29,"service":21,"date":10,"updated":10},"nyc-tco-vs-co-new-building","纽约新建公寓楼的临时使用证明（TCO）与使用证明（CO）","纽约市新建筑申请临时使用证明（TCO）和正式使用证明（CO）各须具备哪些条件，完工收尾通常卡在哪些环节，以及TCO如何续期。",{"slug":31,"title":32,"description":33,"service":21,"date":10,"updated":10},"nyc-six-vs-seven-storeys-site-safety-rules","纽约六层与七层建筑的工地安全规定","纽约市7层或75英尺以上的建筑现属大型建筑，须配备工地安全经理。本文说明相关变化，以及2026年施工主管和SST卡的新规定。",1793066377522]