In New York City, Local Law 154 has prohibited gas, oil and propane equipment in most new buildings under seven stories filed since January 1, 2024, and it extends to all new buildings filed from July 2, 2027. Outside the city, including Long Island, the state All-Electric Buildings Act was upheld by the federal Second Circuit on June 30, 2026, and the court denied rehearing on August 26, 2026. As of October 25, 2026, enforcement remained suspended under a November 2025 court stipulation, and when the suspension ends depends on whether the challengers petition the Supreme Court. Work in an existing building that is not filed as a new building generally falls outside both laws.

Two laws at different stages

New York City's law is in force. The state law has been upheld in court, but as of October 25, 2026 it was not yet being enforced.

NYC Local Law 154 and the NYS All-Electric Buildings Act, as of October 2026
TopicNYC Local Law 154NYS All-Electric Buildings Act
Where it mattersThe five boroughsLong Island, Westchester and the rest of the state outside New York City
StatusIn force since January 1, 2024Upheld on June 30, 2026; enforcement suspended under a court stipulation as of October 25, 2026, so confirm the current status
First buildings coveredGroup R-3 (one- and two-family homes) and all buildings under 7 stories, excluding service hot waterNew buildings of 7 stories or less, excluding commercial and industrial buildings over 100,000 sq ft
Full coverageAll occupancies filed from July 2, 2027, including service hot waterAll new construction from January 1, 2029
What triggers itA New Building filing, or an Alt-CO New Building with Existing Elements to RemainNew construction
Existing buildingsNot covered unless the work is filed as a New BuildingNot covered; owners may keep, repair and replace gas equipment

Local Law 154 dates and exceptions

Local Law 154 of 2021 (opens an external site) prohibits the onsite combustion of fuels that emit more than 25 kg of CO2 per MMBtu in new construction. In practice that rules out natural gas, propane and heating oil for space heating, hot water, cooking and clothes drying in covered buildings.

The rules that apply are set by the filing date of the complete initial GC application in DOB NOW, not by the construction date. The compliance dates are January 1, 2024 for Group R-3 and all buildings under 7 stories (excluding service hot water); December 31, 2024 for NYC School Construction Authority projects; December 31, 2025 for affordable housing under 7 stories (excluding service hot water); July 2, 2027 for all occupancies, including service hot water; and December 31, 2027 for affordable housing of 7 stories or more. Affordable housing here means a building in which at least half of the units are subject to a government affordability agreement. If an application later undergoes a major redesign, DOB requires it to be resubmitted as a new application, and the rules in effect on the new filing date apply.

The law carves out the following.

  • Buildings used by a regulated utility for energy generation.
  • Buildings operated by the Department of Environmental Protection for sewage or food waste treatment.
  • Specific spaces where fossil fuels are necessary for manufacturing, laboratories, laundromats, hospitals and crematoria.
  • Commercial kitchens.
  • Emergency or standby power.

The exceptions attach to the listed spaces or equipment, not to the whole building. A restaurant kitchen in a mixed-use building may use gas while the apartments above are all-electric.

Renovations that count as a new building

Most renovations in existing NYC buildings do not trigger Local Law 154. The deciding question is whether DOB requires the work to be filed as a New Building.

Common NYC projects and Local Law 154, based on DOB guidance
ProjectCovered by LL154Notes
Replacing a gas range, boiler or water heater in an existing buildingNoGas work is still performed by a licensed master plumber under a permit where required
Converting an existing building from oil to gasNoDOB's FAQ states that nothing in the law prohibits it
Gut renovation filed as an Alt-CO New Building with Existing Elements to RemainYesThe project is filed as a New Building and must be designed all-electric
Demolishing a house and building a new oneYesA New Building filing
Dividing a building with active gas service into more unitsNoDOB's FAQ states that the new units may request their own gas accounts and meters
Enlargement that needs a larger gas serviceDependsDOB's FAQ indicates the utility cannot provide the larger service if the alteration increases floor area by more than 110 percent of the existing floor surface

When the classification of a project is unclear, the architect or engineer of record should confirm it with DOB's Sustainability Bureau before filing.

The state law and the court case

The state law requires most new buildings to use electric heating and appliances instead of oil, propane or natural gas. It first applies to new buildings of 7 stories or less, with commercial and industrial buildings over 100,000 sq ft initially excluded, and extends to all new construction from January 1, 2029. Existing buildings are not covered. Owners may continue to use, repair and replace gas or propane equipment, and may renovate or enlarge, without triggering the law.

Gas and HVAC companies, trade associations and unions challenged both the state law and Local Law 154 as preempted by the federal Energy Policy and Conservation Act. On June 30, 2026, the U.S. Court of Appeals for the Second Circuit ruled that neither law is preempted (opens an external site). Because the Ninth Circuit reached the opposite conclusion in 2024 in a case involving Berkeley, California, Supreme Court review is possible.

Under a stipulation filed on November 12, 2025, the state agreed not to enforce the law while the appeal proceeds. As the New York State Association of Towns (opens an external site) summarizes it, the suspension lasts until 120 days after the Second Circuit's decision if no Supreme Court petition is filed; if a petition is filed, it continues until 120 days after the Supreme Court denies review or decides the case. Published law-firm analyses (opens an external site), counting from the June 30 decision, place the end of the suspension on October 28, 2026. The Second Circuit denied rehearing en banc on August 26, 2026, which sets November 24, 2026 as the deadline for a certiorari petition.

As of October 25, 2026, we had found no report that a petition had been filed (opens an external site), and the state requirements were not being enforced. A petition filed by the deadline would extend the suspension, and the state may announce its own effective date. Confirm the current status with your town or village building department, or with the New York State Department of State, before finalizing a design or filing a permit.

  • Fully exempt: mobile homes, hospitals and medical facilities, farm buildings, critical infrastructure such as wastewater treatment facilities, and emergency backup or standby generators.
  • Partially exempt: car washes, commercial kitchens, laboratories, laundromats, crematoria, fuel cell systems and manufacturing facilities, which must still use electric lighting, heating and cooling, and domestic hot water.
  • Waiver: available for a new building when the local utility certifies in writing that it cannot reasonably provide electric service from the grid.

Designing an all-electric house or small building

An all-electric design goes smoothly when the electrical service, the equipment and the space for it are planned together at schematic design.

  • Load calculation first. A licensed electrician performs an NEC Article 220 load calculation. A two-family house with heat pumps, heat pump water heaters, induction cooking and an EV charger can exceed a 200 amp service.
  • Utility service request early. A new or upgraded service from Con Edison or PSEG Long Island is often one of the longest lead items on a new build.
  • Cold-climate heat pumps. Select equipment by its rated capacity at 5°F, as listed in the NEEP cold-climate air-source heat pump list, not by nameplate capacity.
  • Heat pump water heaters. Allow for floor space, airflow and a condensate drain. Basements in NYC row houses usually work; small closets usually do not.
  • Induction cooking and dryers. Plan dedicated 240 volt circuits for the range, and consider heat pump dryers where venting is difficult.
  • Standby power. Both laws exclude emergency or standby generators, so a gas or propane generator remains an option, subject to code, zoning and the engineer's design.

According to the IRS, the federal Energy Efficient Home Improvement Credit (Section 25C) (opens an external site), which previously applied to heat pumps and heat pump water heaters, is not allowed for property placed in service after December 31, 2025. Con Edison and PSEG Long Island have offered heat pump incentives under the NYS Clean Heat program; terms and funding change during the year. We are contractors, not tax advisors. For how any credit or deduction applies to your project, consult a CPA.

For new houses, small multifamily buildings and gut renovations in New York City and on Long Island, we work with the architect or engineer to lay out an all-electric design that fits the available electric service, prepare the load calculation with our licensed partner electricians, file the utility service request early and sequence the permits so the schedule does not stall at the meter. Whether a specific filing is grandfathered is a question for your design professional and, where needed, your attorney.

Frequently asked questions

Are gas stoves banned in New York City?

No. Local Law 154 applies to New Building filings, including Alt-CO New Buildings with Existing Elements to Remain. Existing buildings may keep and replace gas stoves, subject to normal permit and inspection requirements for gas work.

Does the state law apply to a new house on Long Island right now?

As of October 25, 2026, the state requirements were still suspended under a November 2025 court stipulation. Published analyses place the end of the suspension on October 28, 2026, but a Supreme Court petition filed by the November 24, 2026 deadline would extend it. Confirm the current status with your town or village building department before you finalize the design.

Is a gas or propane standby generator allowed in a new building?

Both laws exclude emergency or standby power. Local Law 154 lists emergency or standby power among its exceptions, and the state law fully exempts emergency backup and standby generators. The generator must still meet code and zoning requirements.

Sources

7 sources
  1. Building Electrification (LL154) (opens an external site)NYC Department of Buildings
  2. LL154 Frequently Asked Questions (opens an external site)NYC Department of Buildings
  3. New York City and State Bans on Gas Appliances in New Buildings Upheld by the Second Circuit (opens an external site)Barclay Damon LLP
  4. New York’s All-Electric Buildings Act Survives Challenge and May Go Into Effect This Fall (opens an external site)Carter Ledyard & Milburn LLP
  5. FAQs for modification of sections 25C, 25D, 25E, 30C, 30D, 45L, 45W, and 179D under Public Law 119-21 (OBBB) (opens an external site)Internal Revenue Service
  6. Climate Litigation Updates (October 9, 2026) (opens an external site)Sabin Center for Climate Change Law, Columbia Law School
  7. Update for Town Officials: Delay of the All-Electric Buildings Act (Nov. 2025) (opens an external site)New York State Association of Towns

This guide reflects our experience and our interpretation of the rules as of the date it was published or last updated. Regulations, codes, incentives and the way agencies enforce them change often, and our interpretation may be incomplete or wrong. It is general information, not legal, engineering, tax or financial advice. Consult the relevant agency and a licensed professional before you plan, purchase or begin any work. Reading this guide does not make you our client and does not create any contractor, consulting or advisory relationship. Outstanding Construction Inc is not liable for any loss arising from the use of or reliance on this content, and is responsible only for work performed under a written contract signed with us.